| SITE ID | IVOTUK MET 1 MOSS TOWER (10M HEIGHT) | |||||
| VEG | MOSS/LICHEN/TUSSOCK | |||||
| SOIL | N/A | |||||
| DATE INSTALLED | 04/07/1999 (PREVIOUS SITE INSTALLED IN 1998) | |||||
| LAT | 68.28.82N | |||||
| LONG | 155.44.72W | |||||
| LOGGER | CR10X+MULTIPLEXOR | |||||
| POWER | 12V BATT W/ 10W SOLAR PANEL | |||||
| INSTRUMENTS: | YES? | DATE INSTALLED | BRAND | I.D./SERIAL | DEPTH (CM) | OTHER |
| 1M AT/RH | X | Apr-99 | CSI | |||
| 3M AT/RH | X | Apr-99 | CSI | |||
| 10 M AT/RH | X | Apr-99 | CSI | |||
| 1M W.S. | X | Apr-99 | MET ONE | |||
| 3M W.S./W.D. | ||||||
| 10M W.S./W.D. | X | Apr-99 | RM YOUNG | |||
| NET RADIOMETER | X | Jul-98 | REBS | Q99019 | CF TOP=9.01W/M^2/MV, CF BOTTOM=10.74 | |
| L.W. UP | X | Jul-99 | EPPLEY | 32565F3 | ||
| L.W. DOWN | X | Jul-99 | EPPLEY | 32564F3 | ||
| S.W. UP | X | Jul-99 | EPPLEY | 32542F3 | ||
| S.W. DOWN | X | Jul-99 | EPPLEY | 32543F3 | ||
| PRECIP | X | Jul-98 | TEXAS | |||
| SNOW DEPTH | X | Jul-98 | N/A | |||
| THERMISTOR-1 | X | Jul-98 | ALPHA | 1 | ||
| THERMISTOR-2 | X | Jul-98 | ALPHA | 2.5 | ||
| THERMISTOR-3 | X | Jul-98 | ALPHA | 20 | ||
| THERMISTOR-4 | X | Jul-98 | ALPHA | 35 | ||
| THERMISTOR-5 | X | Jul-98 | ALPHA | 45 | ||
| SMC PROBE-1 | X | Jul-98 | CSI | 1 | 5 | 1.86552 |
| SMC PROBE-2 | X | Jul-98 | CSI | 2 | 10 | 1.89607 |
| SMC PROBE-3 | X | Jul-98 | CSI | 3 | 15 | 1.87298 |
| SMC PROBE-4 | X | Jul-98 | CSI | 4 | 20 | 1.85732 |
| SMC PROBE-5 | X | Jul-98 | CSI | 5 | 35 | 1.90085 |