Project Updates

17 June 2014

Stabilization of Erodible Slopes with Geofibers and Nontraditional Liquid Additives

AUTC Project: 410028

by billy.connor

12 June 2014

Experimental Study of Various Techniques to Protect Ice-Rich Cut Slopes

AUTC Project: 510010

by billy.connor

510010.ZhangFINAL.June.19.14

Experimental Study to Protect Ice-Rich Slope Final Report

24 April 2014

Impact of Embedded Carbon Fiber Heating Panel on the Structural/Mechanical Performance of Roadway Pavement

AUTC Project: 510022

by

510022.Yang.CarbonFiberHeatingPanal.4.2013

21 April 2014

A Corrosion Monitoring System for Existing Reinforced Concrete Structure

AUTC Project: 510000

by

510000.AUTC-FinalReport510000-ver1.0

2 April 2014

Preliminary Design of a Leadership Academy for the Alaska Department of Transportation and Public Facilities, Report to Management, Reviews and Discussions

AUTC Project:

by

Closure REPORT LEADERSHIP ACADEMY

2 April 2014

Work Plan for Special Design Features & Crack Sealing Maintenance for Parks Highway

AUTC Project: 510005

by

Cracks on Parks Highway.Liu.2014

3 March 2014

Use of the Micro-Deval Test for Assessing Alaska Aggregates

AUTC Project: 410009

by

410009.Liu.MicroDeval.FINAL

29 January 2014

Evaluation of Risk in Change Orders Report for AKDOT&PF Construction Staff

AUTC Project: 107059

by

107059.Perkins. Final107059.Appendix D with attachments

29 January 2014

Evaluating the Need to Seal Thermal Cracks in Alaska’s Asphalt Concrete Pavements

AUTC Project: 510005

by

510005.Thermal Crack Sealing_Final Report 07 02 13

29 January 2014

Fairbanks North Star Borough Rural Roads Upgrade Inventory and Cost Estimation Software User Guide: Version I

AUTC Project: 309020

by

309020.Final.Lee

« Newer PostsOlder Posts »